国产va免费精品高清在线观看丨亚洲高清国产拍精品网络战丨激情亚洲一区国产精品丨丰满少妇高潮惨叫视频丨国产超碰人人做人人爱

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:5616 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 亚洲欧洲av无码专区| 日韩在线一区二区三区免费视频| 精品黑人一区二区三区| 人妻在线无码一区二区三区| 女人让男人桶爽30分钟网站| 精品人妻中文字幕有码在线| 国产97在线 | 美洲| 国产色综合久久无码有码| 久久久久久性高| 中文字幕无码专区一va亚洲v专区在线| 国产青草视频在线观看| 免费99精品国产人妻自在现线| 亚洲精品久久久久久动漫器材一区| 麻豆乱码国产一区二区三区| 亚洲国产天堂久久综合| 99精品国产福利一区二区| 午夜福利啪啪片| 亚洲欧洲日产国码高潮αv| 果冻传媒18禁免费视频| 久久天天躁夜夜躁狠狠2018| 92电影网午夜福利| 亚洲精品国产品国语在线app| 内射极品少妇xxxxxhd| 欧美疯狂性受xxxxx另类| 中文字幕大香视频蕉免费| 精品久久久久久成人av| 欧美成人一区二免费视频| 最近的中文字幕在线看视频| 久久久久亚洲波多野结衣 | 西西人体44www大胆无码| 草色噜噜噜av在线观看香蕉| 亚洲国产精品成人无码区| 欧美日韩精品人妻狠狠躁免费视频 | 久久频这里精品99香蕉| 亚洲国产成人久久综合同性| 精品一区二区三区无码免费视频| 日本sm极度另类视频| 久久99国内精品自在现线 | 久久成人亚洲香蕉草草| 国产97在线 | 亚洲| 西西人体午夜大胆无码视频|