国产va免费精品高清在线观看丨亚洲高清国产拍精品网络战丨激情亚洲一区国产精品丨丰满少妇高潮惨叫视频丨国产超碰人人做人人爱

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:5618 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 亚洲中文字幕无码永久在线不卡 | 国产精品永久免费| 又粗又硬整进去好爽视频| 欧美牲交a欧美牲交aⅴ久久| 人妻av中文字幕无码专区| 精品人妻少妇一区二区三区在线| 免费xxxxx大片在线观看网站| 欧美日激情日韩精品嗯| 欧洲美女黑人粗性暴交| 国产对白老熟女正在播放| 99久久无码一区人妻a黑| 亚洲国产成人精品无码区一本| 国产婷婷综合在线视频| 国产成人无码a在线观看不卡| 亚洲精品高清av在线播放| 天干天干啦夜天干天2017| 熟女无套高潮内谢吼叫免费| 男女啪啪永久免费观看网站 | 精品国产av一区二区果冻传媒| 在线 | 国产精品99传媒a| 风韵丰满熟妇啪啪区老老熟妇| 国产精品乱码久久久久软件| 国产情侣作爱视频免费观看| 精品国产乱码久久久久久浪潮小说| 色欲av伊人久久大香线蕉影院| 亚洲国产天堂久久综合226114| 久久久久国产精品人妻aⅴ免费| 国产午夜精品一区二区三区不卡| 米奇777超碰欧美日韩亚洲| 成人av片无码免费网站| 久久精品中文无码资源站| 九九精品无码专区免费| 亚洲伊人久久精品影院| 猫咪av成人永久网站在线观看| 女人爽到喷水的视频大全| 人妻体内射精一区二区三区| 窝窝午夜精品一区二区| 午夜电影院理伦片8888| 欧美成人aaa片一区国产精品| 无套内射在线无码播放| 失禁潮痉挛潮喷av在线无码|